top of page
TEMPORARY SHORING
DRS Engineering has extensive experience in the design of all types of temporary shoring systems ranging from simple shallow cantilever soldier pile and lagging shoring to complex deep excavation shoring using rakers, bracing, temporary tiebacks or soil nails. Our experience enables us to quickly determine the optimum shoring system for your project given your unique ground conditions and physical site characteristics and provide you with designs that will ensure a safe and efficient excavation process with minimum risk to surrounding properties. Our design services include:
- Soldier Pile and Lagging Shoring
- Soil Nailing
- Sheet Piles
- Deep Soil Mixed Shoring
- Secant Pile Shoring
Soldier Pile and Lagging Shoring
1/20
Soil Nailing
1/7
Sheet Piles
1/4
Deep Soil Mixed Shoring
1/3
Secant Pile Shoring
1/4
bottom of page